RENEWABLE POWER GENERATION
The know-how of foundation work cultivated over many years, "Technology ETS" will demonstrate its strengths.
ETS Holdings is constructing an industrial mega solar system as a renewable energy power plant business. As an EPC operator, we can provide total contracts for the construction of solar mega solar systems, including design, material procurement, and construction. Power transmission Utilizing the know-how of foundation work cultivated over many years in steel tower construction, we have abundant achievements in large-scale mega solar development work, and stable long-term earnings. You can rest assured that O & M (operation management / maintenance) that realizes the work will be done. In addition, we will advance into the fields of other renewable energies such as geothermal power generation, wind power generation, and biomass power generation, as well as hydrogen stations and storage battery systems. We will enhance the construction system so that we can proactively respond to diversifying energy-related needs such as the field of systems.
Renewable energy power plants (solar, wind, biomass, etc.) Special high-pressure self-employed line construction
The self-employed lines built by the business operator include special high-voltage overhead power lines (transmission tower construction) and special high-voltage underground power lines. It is necessary to connect to each power company transmission tower network through those media. Our company has the construction ability of self-employed line construction that can connect the electric power generated by renewable energy to the transmission tower network of each electric power by combining many years of power transmission technology, we accept not only self-employed power transmission tower construction but also self-employed underground line construction company with special high voltage.

Work Contents
Description
ETS Holdings will solve the problems of business owners who are worried that the burden on the electric power company is high
and the period until grid interconnection is long. Please contact us first. We also accept "dielectric strength test" at solar power plants!
For consultations and inquiries about various types of construction, please contact from below contact page.
Phone: 03-5957-7662 (direct line to the Power Transmission Division at the head office)

01 Power plant business

02 Extra high voltage substation construction

03 Self-employed power transmission line construction

04 Coordination line construction to an electric power company
Solar power plant maintenance / maintenance (O & M) business
“Are you ready for a power plant emergency?”
“Are you aware of equipment failures and their signs?”
“Are you sure you can prevent the loss of power generation?”
There are various causes for the decrease in power generation, such as equipment troubles, natural disasters such as sudden lightning strikes and strong winds, weed growth and fecal damage caused by birds.
We support the stable operation of power plants through "Solar power plant maintenance and maintenance (O & M) services".
Solar power is a 20-year-old big project. That is why maintenance is so important.
[Features]
〇 Remote monitoring 24 hours a day, 365 days a year
〇 Quickly rush to the site from 400 bases nationwide to quickly isolate and respond to the cause
〇 One-stop support with multi-vendor support
〇 Periodically report on the amount of power generation and the occurrence / response status of alerts to “visualize” the power plant
〇 Periodic inspection service
Service Menu Overview
Description
Classification | Menu item | Service Level | Contents |
---|---|---|---|
Surveillance
| Alert monitoring | Every time an alert occurs (24 hours 365 days) | Continuous monitoring of POS alerts, rush arrangements as needed |
Power generation monitoring | Once a week | Periodically compare and analyze changes in power generation, and make rush arrangements as needed | |
Regular report | Twice a year | Report the alert generation clause, power generation transition, and failure response history in report format | |
Troubleshooting
| Troubleshooting | Every time an alert occurs (Monday-Saturday, 9: 00-17: 00) | Rushing response when a mismatch is detected |
Inspection
| Periodic inspection | Once a year | Visual inspection and power generation performance measurement using measuring instruments (IV curve, insulation resistance, etc.) |
Option
| Cubicle monitoring | Every time an alert occurs (24 hours 365 days) | Constant monitoring of cubicles, rush arrangements as needed, connection of chief engineers |
Camera monitoring | Once a week | Regular appearance check by remote camera | |
Visit on behalf of | As needed | Local visit based on customer’s request | |
Panel cleaning work | As needed | Panel cleaning work in the power plant | |
Weeding work | As needed | Weeding work in the power plant |
I am worried that the burden on the electric power company is high and the period until grid interconnection is long.
Business owners, ETS Holdings will solve your problems.
Please contact us first.
We also accept "dielectric strength test" at solar power plants!
Detailed materials can be downloaded from here
※ For power plants of 50 kW or more, safety inspection by a chief engineer is required by law.
Industrial mega solar Main construction results
Wakayama Prefecture

Construction of Hidakagawa Solar Power Plant, Wakayama Prefecture
Hidakagawa Town, Hidakagawa County, Wakayama Prefecture
Completion: April 2018
Maximum power generation capacity: 623kW
Number of panels: 2,352

Nakahaya Reservoir Solar power generation facility installation work
Tanabe City, Wakayama Prefecture
Completion: January 2016
Maximum power generation capacity: 431kW
Number of panels: 1,722

Shingu City solar installation work
Shingu City, Wakayama Prefecture
Completion: March 2013
Maximum power generation capacity: 1.5MW
Number of panels: 6,244
Fukushima Prefecture

SK Shirakawa solar power plant construction
Shirakawa City, Fukushima Prefecture
Completion: June 2017
Maximum power generation capacity: 30MW
Number of panels: 110,352

Fukushima Prefecture Takadama Solar Power Plant New Construction
Koriyama City, Fukushima Prefecture
Completion: September 2016
Maximum power generation capacity: 640kW
Number of panels: 2,400
Aomori Prefecture

New construction of solar power plant in Nambu Town, Aomori Prefecture
Nambu Town, Sannohe District, Aomori Prefecture
Completion: June 2017
Maximum power generation capacity: 2MW
Number of panels: 7,938

Gonohe Ichonoki solar power plant construction
Gonohe Town, Sannohe District, Aomori Prefecture
Completion: January 2016
Maximum power generation capacity: 1.8MW
Number of panels: 7,458
Miyagi Prefecture

New construction of solar power plant in northern Miyagi prefecture
Northern Miyagi Prefecture
Completion: June 2017
Maximum power generation capacity: 14MW
Number of panels: 48,180
Saitama

New construction of Minano Solar Power Plant, Saitama Prefecture
Chichibu District, Saitama Prefecture
Completion: April 2017
Maximum power generation capacity: 2MW
Number of panels: 9,240
Chiba prefecture

Sodegaura solar power plant construction
Sodegaura City, Chiba Prefecture
Completion: March 2015
Maximum power generation capacity: 1.3MW
Number of panels: 4,648
Fukuoka Prefecture

Kami-Honami Mega Solar Power Plant Construction
Iizuka City, Fukuoka Prefecture
Iizuka City, Fukuoka Prefecture
Completion: February 2015
Number of panels: 12,500
Ibaraki Prefecture
.jpg)
Ibaraki University (Bunkyo 2 etc.) Solar power generation equipment construction
Mito City, Ibaraki Prefecture
Completion: October 2014
Maximum power generation capacity: 120kW
Number of panels: 490
Iwate Prefecture

Solar cell Yahaba power plant plan
Yahaba Town, Shiwa District, Iwate Prefecture
Completion: March 2014
Maximum power generation capacity: 2.0MW
Number of panels: 7,056
Gunma Prefecture

Akagi field solar equipment installation work
Maebashi City, Gunma Prefecture
Completion: July 2013
Maximum power generation capacity: 375kW
Number of panels: 1,500
Shizuoka Prefecture

Kikugawa City Kurasawa Mega Solar Project
Kikugawa City, Shizuoka Prefecture
Completion: September 2013
Maximum power generation capacity: 1.0MW
Number of panels: 8,660
Tochigi Prefecture

Sunlight installation work on the roof of the sawmill
Shioya-cho, Shioya-gun, Tochigi Prefecture
Completion: April 2013
Maximum power generation capacity: 500kW
Number of panels: 2,100
Mie Prefecture